Topographic and Bathymetric Surveys for Achwa HPP3 project in Uganda
Achwa Hydropower Project III is a run-off-the-river hydroelectricity project with an average flow of 65.5 cubic metres (2,310 cu ft) per second and a gross hydraulic head of about 12.5 metres (41 ft).
Scope of work
ZWE was contracted to carry out a Topographical Survey, Bathymetric Survey and Geotechnical Investigations, Test pits excavation (with Analysis) and establishment of temporary benchmarks of the Project.
Project summary details here